As a result of collapsing side walls on a lined pond I've decided to bring my build forward and started this week. Collapsing sides have meant that I need to complete asap and so I've set a target of four days to get the base in, the walls up and the backfilling done.
Started today and managed to get a 7" base laid with steel mesh for support. The BD is aerated and so has a 1" pipe to carry the air line alongside.
Pond is 3m long and between 1m and 2m wide. Depth after putting in the base is about 4' 6" and I'll be going about 2' above ground, so a healthy 6' plus in all.
Bd will feed an Easy Pod via 4" waste pipe and will then be pumped into an Elecro Beadmaster 85 courtesy of an Aquamax 10,000. 2" return. Also a 2" return from a Hozelock 9000 uvc filter which will be fed by a skimmer. I'll be using a 100 litre pump on the BD. Also a 110 Watt UV somewhere along the line! (Where?) Any advice or criticisms gratefully received!
Many thanks to Bob Hart for all his advice which has been very much appreciated. I know it's all been done in a huge rush but I'm fairly confident that all will be well in the end as I've followed all his instructions as closely as possible!!
Also many thanks to everyone on Koi Quest for all their invaluable advice over the last few months. I knew nothing when I started keeping Koi 6 months or so ago and now know nothing still. But at least I know where to go to ask!!


I'll post a couple of pics so you can see that even a novice like me can spend a ridiculous amount of money when the bug hits! Hopefully the fish will be in their new home before Xmas.
Louie